Sunday, 30 October 2016

A bit of green

Gradually creeping along the board with a bit of green. Trying to pretend that I don't have to paint the track.

Wednesday, 19 October 2016

SRI No 9

Unbelievably SRI has reached the toddler age of 18 months.  The issue is the usual eclectic mix of French NG, Hospital lines, US short lines and a little London 3rd rail to boot. Unfettered, and un- formatted - punk model railways.

Monday, 10 October 2016

009 bridge


I got taken to task not once, but three times over the weekend about not blogging. It's not as if there's nothing going on: there's another magazine to edit and a bit of building in the shape of a small 009 layout on the old Barber Lane board. This has started well, but as usual things slow when the structures start to get done - buildings are the time thieves. I put a few things about this on the NG forum, but it's a real pain to get the photos on via photobucket. Anyway as you can see this is a narrow sheep/farm bridge from Wills components and lots of card. The track is laid and wired - now to concentrate on the station building.