Sunday, 5 June 2016

4 to 16

 I'm plugging away on several fronts; all unrelated. The on-going as far as here is concerned is the Art of Compromise which now has a few lamps dotted about. Nothing remarkable, just the Ratio GWR swan neck variety. It's a nice little kit which can be built in a number of shapes. The standard above, with a straight post and single lamp. Below with a bracket, no swan, and just attached to the station shelter.
 Now that it's June,a push to get the garden railway finished. Only about 15' to go now and guess what? I'm six fishplates short. The train however needs a brake and a bit of work has been done on this. The jumping between scales is fun: from the fiddly lamps to the huge bits of 80thou sheet.

2 comments:

  1. Do you think it would be feasible to wire the lamps with LEDs?

    ReplyDelete
  2. Errr.... no.
    CF

    ReplyDelete