Thursday, 28 February 2013

7mm station building done

7mm station building
 The Morton Stanley 7mm station building complete as outlined in the resolutions. http://unnycoombelala.blogspot.co.uk/2013/01/resolution.html
 No detailing with fire buckets/posters etc.yet - I'll do that after it's installed. The idea is to get as many of the main structures done before the board is built that way the layout can live in a large shoebox.
BTW the right hand rear pipe will discharge into a hogshead or similar.
7mm station building

No comments:

Post a Comment